PRELIMINARY
After the contract, all of the project processes such as design, procurement, production and assembling are governed by the ERP system with the detailed work schedule “WBS” (Work Breakdown Structure) which is based on activity list.






APPLICATION PREPARATION
Before the application project study, necessary measurements are made with precision optical devices and the creation of real façade model is provided in computer environment. With the application project, real application axes, system sections, material preferences, connection and insulation details are prepared for material order.

MATERIAL RESOURCES PLANNING
The procurement process is managed through the ERP system, ensuring that the required materials are included in the inventory within the optimum time and conditions. Manufacturing orders are sensitively prepared by the project team with all details suitable with WBS and presented to the planning department.


